|
09/22/2026 11:30 PM
|
|
|
TL;DR Aave is considering adding SG-FORGE’s EURCV euro stablecoin to its V4 Ethereum core instance. The proposal is at the ARFC stage with conditional support from LlamaRisk. EURCV is not yet listed in the V4 market. Aave governance is considering whether to add a regulated euro stablecoin to its next-generation Ethereum market. The proposal would […]
|
|
09/22/2026 10:30 PM
|
|
|
TL;DR Aave governance is reviewing a proposal to onboard Ethena’s USDe to the V4 core instance on Avalanche. USDe uses LayerZero OFT architecture with a 24-hour timelock and an Ethereum escrow model across 31 networks. USDe is not yet live on Aave V4 Avalanche under this proposal. Aave is moving closer to adding Ethena’s USDe […]
|
|
09/22/2026 09:30 PM
|
|
|
TL;DR An Aave ARFC proposes higher collateral efficiency for ETH- and Bitcoin-linked assets. The proposal would raise WETH LTV to 81% and liquidation threshold to 84%. The parameters are still under governance discussion and are not yet live. Aave governance is considering whether borrowers should be able to extract more capital against some of the […]
|
|
09/22/2026 08:30 PM
|
|
|
TL;DR Arbitrum DAO is voting on grant bans for Good Entry, Limitless and APX Finance. The action follows Watchdog cases that recovered roughly 532,000 ARB. The vote remains open through September 23, so the bans are not yet final. Arbitrum DAO is considering formal grant bans for three projects following high-severity cases identified through its […]
|
|
09/22/2026 07:30 PM
|
|
|
TL;DR Optimism Governance is considering Upgrade Proposal 20. The proposal introduces Super Root Dispute Games as part of the OP Stack fault-proof roadmap. A mainnet target of September 24 has been discussed, but the upgrade is not yet live. Optimism Governance is considering another major change to the OP Stack’s fault-proof architecture. Upgrade Proposal 20 […]
|
|
09/22/2026 06:30 PM
|
|
|
TL;DR World Chain activated the Karst upgrade at 12:00 UTC on September 21. Node operators need op-geth v1.101701.0 or newer and op-node v1.16.9 or newer. End users do not need to take any action. World Chain has completed its Karst network upgrade, putting new OP Stack software requirements into effect for node operators. The activation […]
|
|
09/21/2026 12:45 PM
|
|
|
Read the latest update on Celestia Ships v0.34.2-corto Update For Corto Testnet Nodes.
|
|
09/21/2026 12:00 PM
|
|
|
Read the latest update on Starknet's Cairo Toolchain Releases v2.19.5 Update.
|